Tunnel Inspection to Identify the Probable Leakage Locations and Voids in T5 Tunnel at J&K
Scope of Work:
GPR Investigation to map underground Void and Leakage detection up to depth of 3m.
Location:
Inside the T5 tunnel.
Client:
L&T.
Equipment:
GSSI SIR 4000 equipped with 400 MHz center frequency antenna.
Challenges:
Machine movement at Crown area of tunnel.
Summary:
The scope of the project includes the mapping of voids using non-destructive Ground Penetrating Radar (GPR) technology at T-5 Tunnel in Reasi, J&K. The survey has been conducted in the month of May 2022. The scope of the work includes the mapping of voids and probable leakage in the crown and side-walls of tunnel.
The survey has been executed using 400 MHz center frequency antenna mounted with GSSI SIR 4000 GPR systems.